• norsk
    • English
  • English 
    • norsk
    • English
  • Login
View Item 
  •   Home
  • Norges Geotekniske Institutt
  • NGI articles
  • View Item
  •   Home
  • Norges Geotekniske Institutt
  • NGI articles
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Snow avalanche at Bleie, Ullensvang, January 1994.

Lied, Karstein
Chapter
Thumbnail
View/Open
Lied_Instanes_etal(1998).pdf (3.910Mb)
URI
https://hdl.handle.net/11250/3082644
Date
1998
Metadata
Show full item record
Collections
  • NGI articles [1175]
Abstract
A major snow avalanche hit the farms at Bleie, municipality of Ullensvang, January 27 1994. Three dwelling houses were completely destroyed, and several other buildings were destroyed or damaged. The history of the Bleie farms dates back to 1293 a.d. In this period no avalanches are known to having been nearby the farms. Based on historic evidence and climatic records the return period for the avalanche is calculated to 1000 years. The horisonthal length of the avalanche was about 3600 m, 0:- angle 20, comprising to -I standard deviation of runout in the NGI runout model. Based on velocity and volume calculations different methods of protections were assessed by NGl. One of the proposed alternatives was a 10 m high and 110 m long concrete retaining wall 750 m upslope of the farms. The municipality of Ullensvang engaged INSTANES A/S, Consulting Civil Engineers, Bergen, for the design of the structure. The engineering was carried out by civil eng. Bjarne Instanes, and the chosen design is not known to have been used for similar purposes previously. The main feature of the structure is five-and-a-half half-cylindrical shells bound together in a monolithic structure and anchored to the bedrock by 22 rock anchors altogether. At the base the width of the structure is increased by ribs that increases the stability considerably. The global design takes care of the tilting moment as well as shear forces resulting from external loads. The thickness of the reinforced concrete wall is only 0.35 m. Compared with a conventional gravity concrete retaining wall, the saving in construction costs is approximately 40%.
Publisher
Norwegian Geotechnical Institute
Series
NGI Publication;203

Contact Us | Send Feedback

Privacy policy
DSpace software copyright © 2002-2019  DuraSpace

Service from  Unit
 

 

Browse

ArchiveCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsDocument TypesJournalsThis CollectionBy Issue DateAuthorsTitlesSubjectsDocument TypesJournals

My Account

Login

Statistics

View Usage Statistics

Contact Us | Send Feedback

Privacy policy
DSpace software copyright © 2002-2019  DuraSpace

Service from  Unit